Mon - Fri: 9:00 AM - 9:00 PM  |  Sat: 9:00 AM - 1:00 PM

Surveys for the strengthening of the road system of the SS106

Surveys for the strengthening of the road system of the SS106

For the strengthening of the road system of the SS106, Archimeter carried out topographic surveys of the roadway to verify the technical and economic feasibility for carrying out the works.